ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Current-carrying wiring device manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

34

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $504k 69k
MMBtu
$8.81
- Electrical $284k 5,136k
kWh
$0.065
- Natural Gas $89k 16k
MMBtu
$5.76

251

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $59k 7.0k
MMBtu
10.1%
- Electrical $45k 678k
kWh
13.2%
- Natural Gas $5.7k -
MMBtu
-
Waste $0.7k
Productivity/Other $39k
TOTAL $99k
*May be negative reflecting an increased cost component required to save energy and costs overall

32

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $514k 71k
MMBtu
$8.74
- Electrical $288k 5,230k
kWh
$0.065
- Natural Gas $93k 17k
MMBtu
$5.53

108

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 2.2k
MMBtu
3.1%
- Electrical $16k 213k
kWh
4.1%
- Natural Gas $1.5k -
MMBtu
-
Waste -
Productivity/Other $21k
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall