Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Wiring device manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

40

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $619k 110k
MMBtu
$8.30
- Electrical $351k 6,176k
kWh
$0.064
- Natural Gas $143k 47k
MMBtu
$9.44

297

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $53k 6.0k
MMBtu
5.4%
- Electrical $39k 582k
kWh
9.4%
- Natural Gas $5.1k -
MMBtu
-
Waste $0.8k
Productivity/Other $53k
TOTAL $107k
*May be negative reflecting an increased cost component required to save energy and costs overall

39

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $616k 111k
MMBtu
$8.31
- Electrical $346k 6,109k
kWh
$0.064
- Natural Gas $145k 48k
MMBtu
$9.45

142

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 2.7k
MMBtu
2.4%
- Electrical $19k 263k
kWh
4.3%
- Natural Gas $1.5k -
MMBtu
-
Waste -
Productivity/Other $40k
TOTAL $64k
*May be negative reflecting an increased cost component required to save energy and costs overall