ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Wiring device manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

42

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $606k 107k
MMBtu
$8.38
- Electrical $345k 6,055k
kWh
$0.064
- Natural Gas $137k 45k
MMBtu
$9.43

315

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $58k 6.9k
MMBtu
6.4%
- Electrical $44k 669k
kWh
11.0%
- Natural Gas $5.7k -
MMBtu
-
Waste $0.8k
Productivity/Other $54k
TOTAL $113k
*May be negative reflecting an increased cost component required to save energy and costs overall

39

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $616k 111k
MMBtu
$8.31
- Electrical $346k 6,109k
kWh
$0.064
- Natural Gas $145k 48k
MMBtu
$9.45

142

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 2.7k
MMBtu
2.4%
- Electrical $19k 263k
kWh
4.3%
- Natural Gas $1.5k -
MMBtu
-
Waste -
Productivity/Other $40k
TOTAL $64k
*May be negative reflecting an increased cost component required to save energy and costs overall