ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Primary battery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

8

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $725k 111k
MMBtu
$9.69
- Electrical $376k 7,569k
kWh
$0.056
- Natural Gas $107k 28k
MMBtu
$4.25

56

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $209k 27k
MMBtu
24.5%
- Electrical $144k 2,650k
kWh
35.0%
- Natural Gas $14k -
MMBtu
-
Waste -
Productivity/Other ($-51.3)k
TOTAL $157k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $794k 126k
MMBtu
$7.09
- Electrical $422k 8,539k
kWh
$0.054
- Natural Gas $121k 32k
MMBtu
$4.07

28

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $35k 2.2k
MMBtu
1.7%
- Electrical $11k 210k
kWh
2.5%
- Natural Gas $4.2k -
MMBtu
-
Waste -
Productivity/Other $0.7k
TOTAL $36k
*May be negative reflecting an increased cost component required to save energy and costs overall