ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Storage battery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

25

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,160k 319k
MMBtu
$7.53
- Electrical $1,330k 24,896k
kWh
$0.058
- Natural Gas $344k 64k
MMBtu
$6.46

196

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $231k 25k
MMBtu
8.0%
- Electrical $157k 2,479k
kWh
10.0%
- Natural Gas $40k -
MMBtu
-
Waste $3.7k
Productivity/Other $67k
TOTAL $302k
*May be negative reflecting an increased cost component required to save energy and costs overall

22

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,096k 328k
MMBtu
$6.95
- Electrical $1,260k 25,542k
kWh
$0.051
- Natural Gas $345k 66k
MMBtu
$5.92

63

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $61k 9.3k
MMBtu
2.8%
- Electrical $52k 905k
kWh
3.5%
- Natural Gas $0.8k -
MMBtu
-
Waste $4.2k
Productivity/Other $12k
TOTAL $77k
*May be negative reflecting an increased cost component required to save energy and costs overall