ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 335911 Storage battery manufacturing

25

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,160k 319k
MMBtu
$7.53
- Electrical $1,330k 24,896k
kWh
$0.058
- Natural Gas $344k 64k
MMBtu
$6.46

196

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $231k 25k
MMBtu
8.0%
- Electrical $157k 2,479k
kWh
10.0%
- Natural Gas $40k -
MMBtu
-
Waste $3.7k
Productivity/Other $67k
TOTAL $302k
*May be negative reflecting an increased cost component required to save energy and costs overall

21

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,128k 334k
MMBtu
$6.93
- Electrical $1,291k 26,188k
kWh
$0.051
- Natural Gas $343k 66k
MMBtu
$5.95

63

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $64k 9.7k
MMBtu
2.9%
- Electrical $54k 948k
kWh
3.6%
- Natural Gas $0.8k -
MMBtu
-
Waste $4.4k
Productivity/Other $12k
TOTAL $81k