ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Storage battery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

24

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,191k 324k
MMBtu
$7.54
- Electrical $1,361k 25,434k
kWh
$0.058
- Natural Gas $343k 64k
MMBtu
$6.52

190

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $239k 26k
MMBtu
8.1%
- Electrical $163k 2,572k
kWh
10.1%
- Natural Gas $41k -
MMBtu
-
Waste $3.9k
Productivity/Other $70k
TOTAL $313k
*May be negative reflecting an increased cost component required to save energy and costs overall

20

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,131k 337k
MMBtu
$6.92
- Electrical $1,264k 26,220k
kWh
$0.050
- Natural Gas $349k 68k
MMBtu
$5.83

61

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $65k 9.9k
MMBtu
2.9%
- Electrical $55k 961k
kWh
3.7%
- Natural Gas $0.8k -
MMBtu
-
Waste $4.6k
Productivity/Other $13k
TOTAL $83k
*May be negative reflecting an increased cost component required to save energy and costs overall