ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Battery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

33

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,812k 269k
MMBtu
$8.06
- Electrical $1,099k 20,695k
kWh
$0.058
- Natural Gas $287k 55k
MMBtu
$5.93

252

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $226k 26k
MMBtu
9.6%
- Electrical $154k 2,521k
kWh
12.2%
- Natural Gas $33k -
MMBtu
-
Waste $2.8k
Productivity/Other $38k
TOTAL $267k
*May be negative reflecting an increased cost component required to save energy and costs overall

28

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,794k 282k
MMBtu
$6.97
- Electrical $1,074k 21,776k
kWh
$0.052
- Natural Gas $288k 57k
MMBtu
$5.48

91

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $57k 7.8k
MMBtu
2.8%
- Electrical $43k 764k
kWh
3.5%
- Natural Gas $1.7k -
MMBtu
-
Waste $3.3k
Productivity/Other $9.4k
TOTAL $70k
*May be negative reflecting an increased cost component required to save energy and costs overall