ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Battery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

33

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,812k 269k
MMBtu
$8.06
- Electrical $1,099k 20,695k
kWh
$0.058
- Natural Gas $287k 55k
MMBtu
$5.93

252

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $226k 26k
MMBtu
9.6%
- Electrical $154k 2,521k
kWh
12.2%
- Natural Gas $33k -
MMBtu
-
Waste $2.8k
Productivity/Other $38k
TOTAL $267k
*May be negative reflecting an increased cost component required to save energy and costs overall

31

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,750k 274k
MMBtu
$7.63
- Electrical $1,058k 21,198k
kWh
$0.052
- Natural Gas $279k 55k
MMBtu
$5.54

95

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $53k 7.2k
MMBtu
2.6%
- Electrical $40k 705k
kWh
3.3%
- Natural Gas $1.5k -
MMBtu
-
Waste $3.0k
Productivity/Other $8.4k
TOTAL $64k
*May be negative reflecting an increased cost component required to save energy and costs overall