ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other electrical equipment and component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

143

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,118k 171k
MMBtu
$8.99
- Electrical $622k 11,848k
kWh
$0.069
- Natural Gas $269k 49k
MMBtu
$7.49

1,102

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $150k 13k
MMBtu
7.7%
- Electrical $80k 1,292k
kWh
10.9%
- Natural Gas $48k -
MMBtu
-
Waste $4.0k
Productivity/Other $36k
TOTAL $190k
*May be negative reflecting an increased cost component required to save energy and costs overall

132

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,083k 171k
MMBtu
$8.69
- Electrical $606k 11,876k
kWh
$0.069
- Natural Gas $263k 49k
MMBtu
$7.50

431

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $39k 4.2k
MMBtu
2.4%
- Electrical $25k 408k
kWh
3.4%
- Natural Gas $6.6k -
MMBtu
-
Waste $1.4k
Productivity/Other $19k
TOTAL $59k