ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other electrical equipment and component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

149

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,103k 174k
MMBtu
$9.06
- Electrical $601k 11,459k
kWh
$0.069
- Natural Gas $263k 48k
MMBtu
$7.37

1,143

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $147k 13k
MMBtu
7.4%
- Electrical $78k 1,257k
kWh
11.0%
- Natural Gas $46k -
MMBtu
-
Waste $3.9k
Productivity/Other $36k
TOTAL $186k
*May be negative reflecting an increased cost component required to save energy and costs overall

137

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,096k 178k
MMBtu
$8.75
- Electrical $605k 11,801k
kWh
$0.068
- Natural Gas $260k 48k
MMBtu
$7.45

440

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $38k 4.1k
MMBtu
2.3%
- Electrical $24k 397k
kWh
3.4%
- Natural Gas $6.4k -
MMBtu
-
Waste $1.4k
Productivity/Other $18k
TOTAL $57k
*May be negative reflecting an increased cost component required to save energy and costs overall