ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other electrical equipment and component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

138

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,103k 171k
MMBtu
$8.71
- Electrical $628k 11,927k
kWh
$0.069
- Natural Gas $260k 48k
MMBtu
$7.59

1,064

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $152k 13k
MMBtu
7.9%
- Electrical $81k 1,312k
kWh
11.0%
- Natural Gas $49k -
MMBtu
-
Waste $1.7k
Productivity/Other $34k
TOTAL $187k
*May be negative reflecting an increased cost component required to save energy and costs overall

127

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,100k 175k
MMBtu
$8.52
- Electrical $611k 12,074k
kWh
$0.068
- Natural Gas $270k 50k
MMBtu
$7.41

413

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $38k 3.9k
MMBtu
2.2%
- Electrical $24k 383k
kWh
3.2%
- Natural Gas $6.6k -
MMBtu
-
Waste $1.5k
Productivity/Other $18k
TOTAL $57k
*May be negative reflecting an increased cost component required to save energy and costs overall