ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Relay and industrial control manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

20

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $433k 49k
MMBtu
$9.73
- Electrical $262k 3,961k
kWh
$0.069
- Natural Gas $47k 8.4k
MMBtu
$7.11

167

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 4.1k
MMBtu
8.3%
- Electrical $29k 398k
kWh
10.0%
- Natural Gas $4.5k -
MMBtu
-
Waste $1.4k
Productivity/Other $3.1k
TOTAL $50k
*May be negative reflecting an increased cost component required to save energy and costs overall

19

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $357k 47k
MMBtu
$9.21
- Electrical $215k 3,679k
kWh
$0.066
- Natural Gas $50k 8.8k
MMBtu
$7.49

62

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 2.1k
MMBtu
4.4%
- Electrical $12k 200k
kWh
5.4%
- Natural Gas $0.7k -
MMBtu
-
Waste $1.0k
Productivity/Other $1.8k
TOTAL $20k
*May be negative reflecting an increased cost component required to save energy and costs overall