ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Switchgear and switchboard apparatus manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

23

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $600k 86k
MMBtu
$9.44
- Electrical $332k 5,817k
kWh
$0.072
- Natural Gas $166k 26k
MMBtu
$7.70

180

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $62k 4.8k
MMBtu
5.6%
- Electrical $33k 467k
kWh
8.0%
- Natural Gas $12k -
MMBtu
-
Waste $2.2k
Productivity/Other $15k
TOTAL $79k
*May be negative reflecting an increased cost component required to save energy and costs overall

19

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $570k 89k
MMBtu
$8.51
- Electrical $307k 5,957k
kWh
$0.065
- Natural Gas $164k 28k
MMBtu
$7.81

67

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 2.6k
MMBtu
2.9%
- Electrical $14k 254k
kWh
4.3%
- Natural Gas $3.4k -
MMBtu
-
Waste -
Productivity/Other $14k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall