ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Switchgear and switchboard apparatus manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

22

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $578k 83k
MMBtu
$9.52
- Electrical $320k 5,635k
kWh
$0.073
- Natural Gas $155k 25k
MMBtu
$7.55

168

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $57k 4.5k
MMBtu
5.4%
- Electrical $31k 436k
kWh
7.7%
- Natural Gas $9.9k -
MMBtu
-
Waste $2.3k
Productivity/Other $16k
TOTAL $75k
*May be negative reflecting an increased cost component required to save energy and costs overall

18

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $575k 87k
MMBtu
$8.78
- Electrical $308k 6,136k
kWh
$0.063
- Natural Gas $169k 23k
MMBtu
$8.19

63

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 2.6k
MMBtu
3.0%
- Electrical $14k 257k
kWh
4.2%
- Natural Gas $3.6k -
MMBtu
-
Waste -
Productivity/Other $13k
TOTAL $36k
*May be negative reflecting an increased cost component required to save energy and costs overall