ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Electrical equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

80

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $600k 85k
MMBtu
$8.29
- Electrical $327k 6,038k
kWh
$0.061
- Natural Gas $143k 20k
MMBtu
$7.75

624

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $68k 3.7k
MMBtu
4.4%
- Electrical $34k 365k
kWh
6.0%
- Natural Gas $12k -
MMBtu
-
Waste $2.4k
Productivity/Other $6.1k
TOTAL $76k
*May be negative reflecting an increased cost component required to save energy and costs overall

77

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $606k 86k
MMBtu
$8.20
- Electrical $330k 6,147k
kWh
$0.060
- Natural Gas $145k 20k
MMBtu
$7.79

264

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 1.0k
MMBtu
1.1%
- Electrical $15k 95k
kWh
1.5%
- Natural Gas $6.0k -
MMBtu
-
Waste $0.4k
Productivity/Other $2.5k
TOTAL $30k
*May be negative reflecting an increased cost component required to save energy and costs overall