ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Electrical equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

99

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $576k 78k
MMBtu
$9.06
- Electrical $319k 5,530k
kWh
$0.067
- Natural Gas $127k 19k
MMBtu
$7.74

761

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $69k 4.1k
MMBtu
5.3%
- Electrical $36k 402k
kWh
7.3%
- Natural Gas $11k -
MMBtu
-
Waste $2.2k
Productivity/Other $9.2k
TOTAL $80k
*May be negative reflecting an increased cost component required to save energy and costs overall

89

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $569k 80k
MMBtu
$8.71
- Electrical $312k 5,723k
kWh
$0.063
- Natural Gas $133k 19k
MMBtu
$7.92

307

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $26k 1.1k
MMBtu
1.3%
- Electrical $14k 103k
kWh
1.8%
- Natural Gas $5.4k -
MMBtu
-
Waste $0.5k
Productivity/Other $5.8k
TOTAL $32k
*May be negative reflecting an increased cost component required to save energy and costs overall