ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Electrical equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

100

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $580k 79k
MMBtu
$9.05
- Electrical $321k 5,573k
kWh
$0.066
- Natural Gas $130k 19k
MMBtu
$7.77

773

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $70k 4.2k
MMBtu
5.3%
- Electrical $36k 409k
kWh
7.3%
- Natural Gas $11k -
MMBtu
-
Waste $2.2k
Productivity/Other $9.1k
TOTAL $81k
*May be negative reflecting an increased cost component required to save energy and costs overall

91

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $583k 81k
MMBtu
$8.77
- Electrical $321k 5,730k
kWh
$0.064
- Natural Gas $131k 19k
MMBtu
$7.75

314

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $26k 1.1k
MMBtu
1.3%
- Electrical $15k 107k
kWh
1.9%
- Natural Gas $5.3k -
MMBtu
-
Waste $0.5k
Productivity/Other $6.0k
TOTAL $32k
*May be negative reflecting an increased cost component required to save energy and costs overall