ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Major appliance manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

6

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,003k 495k
MMBtu
$5.82
- Electrical $1,092k 29,476k
kWh
$0.036
- Natural Gas $833k 193k
MMBtu
$5.17

58

Recommendations

9.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $203k 26k
MMBtu
5.2%
- Electrical $91k 2,522k
kWh
8.6%
- Natural Gas $37k -
MMBtu
-
Waste $25k
Productivity/Other $7.3k
TOTAL $235k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,707k 470k
MMBtu
$5.39
- Electrical $1,008k 31,402k
kWh
$0.028
- Natural Gas $516k 148k
MMBtu
$5.13

19

Implemented Recommendations

4.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $95k 12k
MMBtu
2.6%
- Electrical $38k 1,199k
kWh
3.8%
- Natural Gas $27k -
MMBtu
-
Waste $23k
Productivity/Other ($-1.3)k
TOTAL $117k
*May be negative reflecting an increased cost component required to save energy and costs overall