ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Household appliance manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

13

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,697k 267k
MMBtu
$7.76
- Electrical $696k 16,939k
kWh
$0.054
- Natural Gas $415k 93k
MMBtu
$5.09

108

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $117k 14k
MMBtu
5.3%
- Electrical $57k 1,379k
kWh
8.1%
- Natural Gas $19k -
MMBtu
-
Waste $12k
Productivity/Other $6.9k
TOTAL $136k
*May be negative reflecting an increased cost component required to save energy and costs overall

12

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,809k 287k
MMBtu
$7.30
- Electrical $734k 18,155k
kWh
$0.050
- Natural Gas $449k 101k
MMBtu
$5.51

47

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $44k 5.8k
MMBtu
2.0%
- Electrical $22k 570k
kWh
3.1%
- Natural Gas $9.0k -
MMBtu
-
Waste $12k
Productivity/Other $2.5k
TOTAL $59k
*May be negative reflecting an increased cost component required to save energy and costs overall