ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Household appliance manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

12

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,809k 287k
MMBtu
$7.30
- Electrical $734k 18,155k
kWh
$0.050
- Natural Gas $449k 101k
MMBtu
$5.51

102

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $122k 15k
MMBtu
5.2%
- Electrical $59k 1,464k
kWh
8.1%
- Natural Gas $21k -
MMBtu
-
Waste $13k
Productivity/Other $7.5k
TOTAL $143k
*May be negative reflecting an increased cost component required to save energy and costs overall

10

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,452k 235k
MMBtu
$7.42
- Electrical $628k 16,661k
kWh
$0.050
- Natural Gas $246k 64k
MMBtu
$5.56

36

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 5.8k
MMBtu
2.5%
- Electrical $21k 570k
kWh
3.4%
- Natural Gas $11k -
MMBtu
-
Waste $9.2k
Productivity/Other $3.0k
TOTAL $59k
*May be negative reflecting an increased cost component required to save energy and costs overall