ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other lighting equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

6

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $408k 51k
MMBtu
$9.36
- Electrical $256k 3,834k
kWh
$0.064
- Natural Gas $77k 12k
MMBtu
$7.20

45

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 3.1k
MMBtu
5.9%
- Electrical $22k 298k
kWh
7.8%
- Natural Gas $0.5k -
MMBtu
-
Waste $7.4k
Productivity/Other $11k
TOTAL $59k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $408k 51k
MMBtu
$9.36
- Electrical $256k 3,834k
kWh
$0.064
- Natural Gas $77k 12k
MMBtu
$7.20

20

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 0.7k
MMBtu
1.3%
- Electrical $5.6k 67k
kWh
1.8%
- Natural Gas $0.1k -
MMBtu
-
Waste $0.1k
Productivity/Other $0.5k
TOTAL $16k
*May be negative reflecting an increased cost component required to save energy and costs overall