ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Commercial, industrial, and institutional electric lighting fixture manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

14

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $691k 71k
MMBtu
$10.20
- Electrical $354k 4,805k
kWh
$0.078
- Natural Gas $194k 22k
MMBtu
$9.62

111

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $83k 5.7k
MMBtu
8.1%
- Electrical $56k 558k
kWh
11.6%
- Natural Gas $19k -
MMBtu
-
Waste -
Productivity/Other $54k
TOTAL $137k
*May be negative reflecting an increased cost component required to save energy and costs overall

13

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $732k 75k
MMBtu
$10.15
- Electrical $376k 5,109k
kWh
$0.077
- Natural Gas $205k 23k
MMBtu
$9.70

57

Implemented Recommendations

4.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $50k 3.8k
MMBtu
5.0%
- Electrical $41k 370k
kWh
7.2%
- Natural Gas $5.1k -
MMBtu
-
Waste -
Productivity/Other $20k
TOTAL $70k
*May be negative reflecting an increased cost component required to save energy and costs overall