ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Lighting fixture manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

28

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $677k 84k
MMBtu
$10.13
- Electrical $300k 5,519k
kWh
$0.069
- Natural Gas $240k 27k
MMBtu
$8.35

229

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $99k 5.6k
MMBtu
6.7%
- Electrical $41k 548k
kWh
9.9%
- Natural Gas $43k -
MMBtu
-
Waste $2.2k
Productivity/Other $36k
TOTAL $136k
*May be negative reflecting an increased cost component required to save energy and costs overall

26

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $716k 90k
MMBtu
$9.40
- Electrical $318k 5,892k
kWh
$0.066
- Natural Gas $256k 29k
MMBtu
$8.06

108

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $35k 3.3k
MMBtu
3.7%
- Electrical $25k 320k
kWh
5.4%
- Natural Gas $3.5k -
MMBtu
-
Waste $0.0k
Productivity/Other $14k
TOTAL $49k
*May be negative reflecting an increased cost component required to save energy and costs overall