ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Electric lighting equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

30

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $674k 84k
MMBtu
$9.96
- Electrical $296k 5,552k
kWh
$0.067
- Natural Gas $232k 27k
MMBtu
$8.32

244

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $97k 5.7k
MMBtu
6.8%
- Electrical $40k 558k
kWh
10.0%
- Natural Gas $40k -
MMBtu
-
Waste $2.3k
Productivity/Other $34k
TOTAL $133k
*May be negative reflecting an increased cost component required to save energy and costs overall

28

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $710k 89k
MMBtu
$9.28
- Electrical $313k 5,900k
kWh
$0.065
- Natural Gas $247k 29k
MMBtu
$8.05

111

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 3.2k
MMBtu
3.5%
- Electrical $24k 308k
kWh
5.2%
- Natural Gas $3.2k -
MMBtu
-
Waste $0.0k
Productivity/Other $13k
TOTAL $48k
*May be negative reflecting an increased cost component required to save energy and costs overall