ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Electric lighting equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

33

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $661k 81k
MMBtu
$10.22
- Electrical $295k 5,394k
kWh
$0.070
- Natural Gas $216k 26k
MMBtu
$7.96

258

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $92k 5.6k
MMBtu
6.8%
- Electrical $39k 544k
kWh
10.1%
- Natural Gas $37k -
MMBtu
-
Waste $2.0k
Productivity/Other $31k
TOTAL $125k
*May be negative reflecting an increased cost component required to save energy and costs overall

29

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $691k 87k
MMBtu
$9.33
- Electrical $304k 5,726k
kWh
$0.065
- Natural Gas $240k 28k
MMBtu
$8.07

118

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 3.1k
MMBtu
3.5%
- Electrical $23k 298k
kWh
5.2%
- Natural Gas $3.2k -
MMBtu
-
Waste $0.0k
Productivity/Other $13k
TOTAL $46k
*May be negative reflecting an increased cost component required to save energy and costs overall