ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Electrical equipment, appliance, and component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

303

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $900k 134k
MMBtu
$9.36
- Electrical $476k 8,952k
kWh
$0.070
- Natural Gas $216k 37k
MMBtu
$7.46

2,341

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $114k 9.3k
MMBtu
7.0%
- Electrical $61k 909k
kWh
10.2%
- Natural Gas $31k -
MMBtu
-
Waste $3.4k
Productivity/Other $30k
TOTAL $147k
*May be negative reflecting an increased cost component required to save energy and costs overall

277

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $901k 138k
MMBtu
$8.91
- Electrical $478k 9,212k
kWh
$0.066
- Natural Gas $218k 38k
MMBtu
$7.54

939

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $35k 3.1k
MMBtu
2.3%
- Electrical $22k 303k
kWh
3.3%
- Natural Gas $5.6k -
MMBtu
-
Waste $1.4k
Productivity/Other $13k
TOTAL $49k
*May be negative reflecting an increased cost component required to save energy and costs overall