ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Electrical equipment, appliance, and component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

293

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $915k 137k
MMBtu
$9.09
- Electrical $485k 9,137k
kWh
$0.068
- Natural Gas $221k 38k
MMBtu
$7.55

2,263

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $116k 9.4k
MMBtu
6.9%
- Electrical $61k 921k
kWh
10.1%
- Natural Gas $32k -
MMBtu
-
Waste $3.5k
Productivity/Other $25k
TOTAL $144k
*May be negative reflecting an increased cost component required to save energy and costs overall

272

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $896k 135k
MMBtu
$8.88
- Electrical $480k 9,318k
kWh
$0.066
- Natural Gas $220k 38k
MMBtu
$7.58

932

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 3.0k
MMBtu
2.2%
- Electrical $21k 295k
kWh
3.2%
- Natural Gas $5.7k -
MMBtu
-
Waste $1.4k
Productivity/Other $13k
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall