ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Instruments and related products manufacturing for measuring, displaying, and controlling industrial
SIC 2+ Digits Required
3+ Characters Required for Products

27

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $271k 35k
MMBtu
$11.21
- Electrical $180k 2,795k
kWh
$0.088
- Natural Gas $26k 6.3k
MMBtu
$8.77

223

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $39k 4.1k
MMBtu
11.6%
- Electrical $25k 396k
kWh
14.2%
- Natural Gas $1.6k -
MMBtu
-
Waste $2.3k
Productivity/Other $14k
TOTAL $56k
*May be negative reflecting an increased cost component required to save energy and costs overall

25

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $265k 35k
MMBtu
$10.41
- Electrical $173k 2,765k
kWh
$0.081
- Natural Gas $27k 6.5k
MMBtu
$8.55

116

Implemented Recommendations

4.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 2.2k
MMBtu
6.5%
- Electrical $14k 219k
kWh
7.9%
- Natural Gas $1.0k -
MMBtu
-
Waste $0.1k
Productivity/Other $9.4k
TOTAL $29k
*May be negative reflecting an increased cost component required to save energy and costs overall