ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Instruments and related products manufacturing for measuring, displaying, and controlling industrial
SIC 2+ Digits Required
3+ Characters Required for Products

31

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $288k 34k
MMBtu
$11.41
- Electrical $190k 2,733k
kWh
$0.092
- Natural Gas $28k 6.3k
MMBtu
$8.59

249

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 4.2k
MMBtu
12.1%
- Electrical $29k 406k
kWh
14.9%
- Natural Gas $1.9k -
MMBtu
-
Waste $2.8k
Productivity/Other $13k
TOTAL $58k
*May be negative reflecting an increased cost component required to save energy and costs overall

26

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $278k 36k
MMBtu
$10.33
- Electrical $184k 2,895k
kWh
$0.080
- Natural Gas $27k 6.5k
MMBtu
$8.29

116

Implemented Recommendations

4.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 2.2k
MMBtu
6.0%
- Electrical $13k 211k
kWh
7.3%
- Natural Gas $1.0k -
MMBtu
-
Waste $0.1k
Productivity/Other $9.0k
TOTAL $28k
*May be negative reflecting an increased cost component required to save energy and costs overall