ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Instruments and related products manufacturing for measuring, displaying, and controlling industrial
SIC 2+ Digits Required
3+ Characters Required for Products

26

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $278k 36k
MMBtu
$10.33
- Electrical $184k 2,895k
kWh
$0.080
- Natural Gas $27k 6.5k
MMBtu
$8.29

219

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 4.2k
MMBtu
11.6%
- Electrical $25k 409k
kWh
14.1%
- Natural Gas $1.7k -
MMBtu
-
Waste $2.4k
Productivity/Other $15k
TOTAL $57k
*May be negative reflecting an increased cost component required to save energy and costs overall

24

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $265k 35k
MMBtu
$10.26
- Electrical $172k 2,798k
kWh
$0.080
- Natural Gas $28k 6.7k
MMBtu
$8.90

116

Implemented Recommendations

4.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 2.3k
MMBtu
6.6%
- Electrical $14k 229k
kWh
8.2%
- Natural Gas $1.1k -
MMBtu
-
Waste $0.2k
Productivity/Other $9.8k
TOTAL $30k
*May be negative reflecting an increased cost component required to save energy and costs overall