ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Search, detection, navigation, guidance, aeronautical, and nautical system and instrument manufactur
SIC 2+ Digits Required
3+ Characters Required for Products

21

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,319k 211k
MMBtu
$7.56
- Electrical $667k 14,538k
kWh
$0.055
- Natural Gas $205k 62k
MMBtu
$6.77

139

Recommendations

6.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $79k 8.9k
MMBtu
4.2%
- Electrical $46k 868k
kWh
6.0%
- Natural Gas $6.3k -
MMBtu
-
Waste $0.2k
Productivity/Other $68k
TOTAL $147k
*May be negative reflecting an increased cost component required to save energy and costs overall

20

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,245k 205k
MMBtu
$7.52
- Electrical $622k 14,118k
kWh
$0.055
- Natural Gas $189k 60k
MMBtu
$6.82

39

Implemented Recommendations

2.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 2.9k
MMBtu
1.4%
- Electrical $14k 279k
kWh
2.0%
- Natural Gas $0.3k -
MMBtu
-
Waste -
Productivity/Other $28k
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall