ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Electromedical and electrotherapeutic apparatus manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,076k 106k
MMBtu
$10.78
- Electrical $762k 8,821k
kWh
$0.086
- Natural Gas $83k 15k
MMBtu
$4.87

69

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $155k 13k
MMBtu
12.1%
- Electrical $121k 1,247k
kWh
14.1%
- Natural Gas $5.4k -
MMBtu
-
Waste -
Productivity/Other $25k
TOTAL $180k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,250k 104k
MMBtu
$11.97
- Electrical $927k 9,347k
kWh
$0.098
- Natural Gas $56k 8.2k
MMBtu
$3.96

31

Implemented Recommendations

5.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $171k 14k
MMBtu
13.3%
- Electrical $134k 1,355k
kWh
14.5%
- Natural Gas $3.1k -
MMBtu
-
Waste -
Productivity/Other $14k
TOTAL $185k
*May be negative reflecting an increased cost component required to save energy and costs overall