The ITAC Statistics page displays the average assessment results for the selected criteria.
133
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $641k | 93k |
MMBtu
|
$10.30 |
- Electrical | $405k | 6,277k |
kWh
|
$0.082 |
- Natural Gas | $69k | 28k |
MMBtu
|
$7.17 |
978
Recommendations
7.4
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $75k | 7.2k |
MMBtu
|
7.7% |
- Electrical | $53k | 702k |
kWh
|
11.2% |
- Natural Gas | $6.1k | - |
MMBtu
|
- |
Waste | $1.7k | |||
Productivity/Other | $44k | |||
TOTAL | $121k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
125
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $652k | 96k |
MMBtu
|
$10.11 |
- Electrical | $412k | 6,419k |
kWh
|
$0.080 |
- Natural Gas | $69k | 29k |
MMBtu
|
$7.03 |
429
Implemented Recommendations
3.4
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $35k | 3.4k |
MMBtu
|
3.6% |
- Electrical | $26k | 335k |
kWh
|
5.2% |
- Natural Gas | $2.1k | - |
MMBtu
|
- |
Waste | $0.5k | |||
Productivity/Other | $28k | |||
TOTAL | $64k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |