The ITAC Statistics page displays the average assessment results for the selected criteria.
128
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $651k | 96k |
MMBtu
|
$10.09 |
- Electrical | $411k | 6,431k |
kWh
|
$0.079 |
- Natural Gas | $70k | 29k |
MMBtu
|
$7.06 |
951
Recommendations
7.4
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $76k | 7.3k |
MMBtu
|
7.6% |
- Electrical | $53k | 714k |
kWh
|
11.1% |
- Natural Gas | $6.2k | - |
MMBtu
|
- |
Waste | $1.6k | |||
Productivity/Other | $45k | |||
TOTAL | $123k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
119
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $665k | 99k |
MMBtu
|
$10.02 |
- Electrical | $419k | 6,580k |
kWh
|
$0.079 |
- Natural Gas | $71k | 31k |
MMBtu
|
$7.11 |
403
Implemented Recommendations
3.4
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $35k | 3.5k |
MMBtu
|
3.5% |
- Electrical | $26k | 340k |
kWh
|
5.2% |
- Natural Gas | $2.2k | - |
MMBtu
|
- |
Waste | $0.5k | |||
Productivity/Other | $29k | |||
TOTAL | $65k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |