ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Printed circuit assembly (electronic assembly) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

47

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $548k 61k
MMBtu
$11.44
- Electrical $375k 5,313k
kWh
$0.083
- Natural Gas $32k 5.9k
MMBtu
$8.11

339

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $86k 10k
MMBtu
16.6%
- Electrical $76k 990k
kWh
18.6%
- Natural Gas ($-6.3)k -
MMBtu
-
Waste $0.3k
Productivity/Other $48k
TOTAL $135k
*May be negative reflecting an increased cost component required to save energy and costs overall

42

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $593k 65k
MMBtu
$11.57
- Electrical $402k 5,795k
kWh
$0.079
- Natural Gas $34k 4.9k
MMBtu
$7.99

131

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 4.3k
MMBtu
6.7%
- Electrical $26k 422k
kWh
7.3%
- Natural Gas $0.1k -
MMBtu
-
Waste $0.1k
Productivity/Other $47k
TOTAL $81k
*May be negative reflecting an increased cost component required to save energy and costs overall