Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Printed circuit assembly (electronic assembly) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

44

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $571k 62k
MMBtu
$11.72
- Electrical $386k 5,559k
kWh
$0.080
- Natural Gas $33k 4.7k
MMBtu
$8.08

319

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $82k 10k
MMBtu
16.5%
- Electrical $73k 1,002k
kWh
18.0%
- Natural Gas ($-7.2)k -
MMBtu
-
Waste $0.4k
Productivity/Other $51k
TOTAL $134k
*May be negative reflecting an increased cost component required to save energy and costs overall

40

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $608k 67k
MMBtu
$11.41
- Electrical $414k 5,991k
kWh
$0.079
- Natural Gas $35k 5.1k
MMBtu
$8.13

121

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 4.5k
MMBtu
6.7%
- Electrical $27k 437k
kWh
7.3%
- Natural Gas $0.1k -
MMBtu
-
Waste $0.1k
Productivity/Other $34k
TOTAL $69k
*May be negative reflecting an increased cost component required to save energy and costs overall