ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Electronic connector manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

25

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $371k 46k
MMBtu
$10.64
- Electrical $286k 4,230k
kWh
$0.086
- Natural Gas $23k 2.8k
MMBtu
$7.84

186

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $60k 5.5k
MMBtu
11.9%
- Electrical $38k 538k
kWh
12.7%
- Natural Gas $12k -
MMBtu
-
Waste $1.5k
Productivity/Other $8.6k
TOTAL $70k
*May be negative reflecting an increased cost component required to save energy and costs overall

24

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $359k 45k
MMBtu
$10.67
- Electrical $279k 4,160k
kWh
$0.086
- Natural Gas $22k 2.7k
MMBtu
$7.86

96

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 3.4k
MMBtu
7.6%
- Electrical $20k 335k
kWh
8.1%
- Natural Gas ($-0.1)k -
MMBtu
-
Waste $1.5k
Productivity/Other $4.4k
TOTAL $29k
*May be negative reflecting an increased cost component required to save energy and costs overall