ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Capacitor, resistor, coil, transformer, and other inductor manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

32

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $508k 61k
MMBtu
$11.45
- Electrical $337k 4,859k
kWh
$0.086
- Natural Gas $53k 11k
MMBtu
$4.91

270

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $69k 6.2k
MMBtu
10.2%
- Electrical $47k 608k
kWh
12.5%
- Natural Gas $5.6k -
MMBtu
-
Waste $0.3k
Productivity/Other $37k
TOTAL $106k
*May be negative reflecting an increased cost component required to save energy and costs overall

31

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $499k 62k
MMBtu
$11.17
- Electrical $332k 4,915k
kWh
$0.084
- Natural Gas $55k 11k
MMBtu
$5.07

139

Implemented Recommendations

4.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $36k 3.0k
MMBtu
4.8%
- Electrical $25k 290k
kWh
5.9%
- Natural Gas $5.3k -
MMBtu
-
Waste $0.2k
Productivity/Other $3.9k
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall