ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Bare printed circuit board manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

32

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $570k 389k
MMBtu
$8.75
- Electrical $376k 6,641k
kWh
$0.068
- Natural Gas $45k 8.9k
MMBtu
$6.63

247

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 4.5k
MMBtu
1.1%
- Electrical $27k 435k
kWh
6.6%
- Natural Gas $2.3k -
MMBtu
-
Waste $3.9k
Productivity/Other $24k
TOTAL $72k
*May be negative reflecting an increased cost component required to save energy and costs overall

31

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $575k 400k
MMBtu
$8.70
- Electrical $376k 6,745k
kWh
$0.067
- Natural Gas $46k 9.1k
MMBtu
$6.73

93

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $15k 1.5k
MMBtu
0.4%
- Electrical $8.3k 147k
kWh
2.2%
- Natural Gas $0.7k -
MMBtu
-
Waste $0.1k
Productivity/Other $4.5k
TOTAL $20k
*May be negative reflecting an increased cost component required to save energy and costs overall