ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Semiconductor and other electronic component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

230

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $753k 144k
MMBtu
$10.36
- Electrical $514k 8,706k
kWh
$0.080
- Natural Gas $79k 11k
MMBtu
$7.30

1,723

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $104k 11k
MMBtu
7.4%
- Electrical $76k 1,039k
kWh
11.9%
- Natural Gas $9.5k -
MMBtu
-
Waste $2.1k
Productivity/Other $42k
TOTAL $149k
*May be negative reflecting an increased cost component required to save energy and costs overall

214

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $766k 150k
MMBtu
$10.24
- Electrical $521k 8,932k
kWh
$0.077
- Natural Gas $81k 11k
MMBtu
$7.29

744

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 5.0k
MMBtu
3.3%
- Electrical $36k 485k
kWh
5.4%
- Natural Gas $3.2k -
MMBtu
-
Waste $0.8k
Productivity/Other $15k
TOTAL $60k
*May be negative reflecting an increased cost component required to save energy and costs overall