ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Semiconductor and other electronic component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

215

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $778k 151k
MMBtu
$10.22
- Electrical $530k 9,069k
kWh
$0.077
- Natural Gas $83k 12k
MMBtu
$7.19

1,617

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $105k 11k
MMBtu
7.3%
- Electrical $76k 1,073k
kWh
11.8%
- Natural Gas $9.9k -
MMBtu
-
Waste $2.3k
Productivity/Other $41k
TOTAL $148k
*May be negative reflecting an increased cost component required to save energy and costs overall

192

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $799k 162k
MMBtu
$9.80
- Electrical $543k 9,572k
kWh
$0.074
- Natural Gas $80k 12k
MMBtu
$6.96

676

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $46k 5.2k
MMBtu
3.2%
- Electrical $37k 510k
kWh
5.3%
- Natural Gas $3.6k -
MMBtu
-
Waste $0.7k
Productivity/Other $11k
TOTAL $58k
*May be negative reflecting an increased cost component required to save energy and costs overall