Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Semiconductor and other electronic component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

232

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $754k 143k
MMBtu
$10.45
- Electrical $515k 8,666k
kWh
$0.080
- Natural Gas $78k 11k
MMBtu
$7.35

1,733

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $104k 11k
MMBtu
7.4%
- Electrical $75k 1,031k
kWh
11.9%
- Natural Gas $9.4k -
MMBtu
-
Waste $2.1k
Productivity/Other $42k
TOTAL $148k
*May be negative reflecting an increased cost component required to save energy and costs overall

217

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $763k 149k
MMBtu
$10.28
- Electrical $519k 8,900k
kWh
$0.078
- Natural Gas $80k 11k
MMBtu
$7.32

751

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 4.9k
MMBtu
3.3%
- Electrical $36k 481k
kWh
5.4%
- Natural Gas $3.2k -
MMBtu
-
Waste $0.8k
Productivity/Other $16k
TOTAL $62k