ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Audio and video equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $380k 28k
MMBtu
$15.31
- Electrical $239k 2,325k
kWh
$0.13
- Natural Gas $48k 3.8k
MMBtu
$10.09

42

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $88k 5.5k
MMBtu
20.0%
- Electrical $66k 539k
kWh
23.2%
- Natural Gas $7.5k -
MMBtu
-
Waste -
Productivity/Other $5.3k
TOTAL $94k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $380k 28k
MMBtu
$15.31
- Electrical $239k 2,325k
kWh
$0.13
- Natural Gas $48k 3.8k
MMBtu
$10.09

13

Implemented Recommendations

2.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 1.5k
MMBtu
5.3%
- Electrical $20k 144k
kWh
6.2%
- Natural Gas $5.1k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $29k
*May be negative reflecting an increased cost component required to save energy and costs overall