ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other communications equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $984k 153k
MMBtu
$6.33
- Electrical $632k 14,636k
kWh
$0.038
- Natural Gas $9.6k 1.7k
MMBtu
$3.65

16

Recommendations

5.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 4.3k
MMBtu
2.8%
- Electrical $17k 417k
kWh
2.8%
- Natural Gas $0.1k -
MMBtu
-
Waste $0.2k
Productivity/Other $1.3k
TOTAL $27k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,357k 213k
MMBtu
$5.99
- Electrical $886k 20,687k
kWh
$0.033
- Natural Gas $3.0k 0.6k
MMBtu
$2.55

3

Implemented Recommendations

1.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $4.4k 1.0k
MMBtu
0.5%
- Electrical $1.7k 100k
kWh
0.5%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $2.0k
TOTAL $6.4k
*May be negative reflecting an increased cost component required to save energy and costs overall