ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Communications equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

24

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $441k 55k
MMBtu
$9.81
- Electrical $256k 4,804k
kWh
$0.065
- Natural Gas $42k 5.8k
MMBtu
$8.15

170

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $46k 4.7k
MMBtu
8.5%
- Electrical $25k 456k
kWh
9.5%
- Natural Gas $9.9k -
MMBtu
-
Waste $0.4k
Productivity/Other $7.7k
TOTAL $54k
*May be negative reflecting an increased cost component required to save energy and costs overall

20

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $499k 63k
MMBtu
$9.17
- Electrical $288k 5,517k
kWh
$0.057
- Natural Gas $48k 6.7k
MMBtu
$8.51

59

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $11k 1.3k
MMBtu
2.0%
- Electrical $7.5k 123k
kWh
2.2%
- Natural Gas $0.1k -
MMBtu
-
Waste -
Productivity/Other $6.7k
TOTAL $18k
*May be negative reflecting an increased cost component required to save energy and costs overall