The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC | 2+ Digits Required | |
NAICS | Computer terminal and other computer peripheral equipment manufacturing | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
9
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $232k | 19k |
MMBtu
|
$9.35 |
- Electrical | $182k | 1,673k |
kWh
|
$0.075 |
- Natural Gas | $13k | 1.6k |
MMBtu
|
$5.64 |
61
Recommendations
6.8
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $87k | 7.8k |
MMBtu
|
41.8% |
- Electrical | $76k | 765k |
kWh
|
45.8% |
- Natural Gas | $1.0k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $22k | |||
TOTAL | $108k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
8
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $245k | 20k |
MMBtu
|
$8.91 |
- Electrical | $192k | 1,770k |
kWh
|
$0.071 |
- Natural Gas | $13k | 1.7k |
MMBtu
|
$5.04 |
29
Implemented Recommendations
3.6
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $41k | 5.0k |
MMBtu
|
25.3% |
- Electrical | $36k | 491k |
kWh
|
27.7% |
- Natural Gas | $0.5k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $0.9k | |||
TOTAL | $41k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |