ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Computer terminal and other computer peripheral equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

10

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $219k 18k
MMBtu
$9.15
- Electrical $170k 1,636k
kWh
$0.072
- Natural Gas $12k 1.6k
MMBtu
$5.55

65

Recommendations

6.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $79k 7.3k
MMBtu
39.5%
- Electrical $70k 708k
kWh
43.3%
- Natural Gas $0.9k -
MMBtu
-
Waste -
Productivity/Other $25k
TOTAL $104k
*May be negative reflecting an increased cost component required to save energy and costs overall

10

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $219k 18k
MMBtu
$9.15
- Electrical $170k 1,636k
kWh
$0.072
- Natural Gas $12k 1.6k
MMBtu
$5.55

32

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 4.1k
MMBtu
22.1%
- Electrical $29k 396k
kWh
24.2%
- Natural Gas $0.4k -
MMBtu
-
Waste -
Productivity/Other $8.5k
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall