ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Computer terminal and other computer peripheral equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $232k 19k
MMBtu
$9.35
- Electrical $182k 1,673k
kWh
$0.075
- Natural Gas $13k 1.6k
MMBtu
$5.64

61

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $87k 7.8k
MMBtu
41.8%
- Electrical $76k 765k
kWh
45.8%
- Natural Gas $1.0k -
MMBtu
-
Waste -
Productivity/Other $22k
TOTAL $108k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $232k 19k
MMBtu
$9.35
- Electrical $182k 1,673k
kWh
$0.075
- Natural Gas $13k 1.6k
MMBtu
$5.64

32

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $37k 4.5k
MMBtu
24.0%
- Electrical $32k 440k
kWh
26.3%
- Natural Gas $0.4k -
MMBtu
-
Waste -
Productivity/Other $9.4k
TOTAL $46k
*May be negative reflecting an increased cost component required to save energy and costs overall