ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Computer storage device manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,056k 172k
MMBtu
$8.70
- Electrical $753k 15,050k
kWh
$0.082
- Natural Gas $108k 18k
MMBtu
$4.86

23

Recommendations

5.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $68k 9.3k
MMBtu
5.4%
- Electrical $62k 907k
kWh
6.0%
- Natural Gas ($-1.8)k -
MMBtu
-
Waste -
Productivity/Other $0.5k
TOTAL $68k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,112k 191k
MMBtu
$9.09
- Electrical $773k 16,752k
kWh
$0.086
- Natural Gas $123k 19k
MMBtu
$5.16

4

Implemented Recommendations

1.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $2.2k 0.1k
MMBtu
0.1%
- Electrical $2.2k 13k
kWh
0.1%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $2.2k
*May be negative reflecting an increased cost component required to save energy and costs overall