ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Computer and peripheral equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

20

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $677k 85k
MMBtu
$11.12
- Electrical $513k 7,167k
kWh
$0.091
- Natural Gas $92k 12k
MMBtu
$5.56

135

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $83k 7.3k
MMBtu
8.6%
- Electrical $71k 715k
kWh
10.0%
- Natural Gas $2.1k -
MMBtu
-
Waste $5.7k
Productivity/Other $91k
TOTAL $180k
*May be negative reflecting an increased cost component required to save energy and costs overall

18

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $696k 87k
MMBtu
$11.22
- Electrical $526k 7,362k
kWh
$0.091
- Natural Gas $98k 12k
MMBtu
$5.37

50

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 2.7k
MMBtu
3.1%
- Electrical $23k 260k
kWh
3.5%
- Natural Gas $2.8k -
MMBtu
-
Waste -
Productivity/Other $0.4k
TOTAL $29k
*May be negative reflecting an increased cost component required to save energy and costs overall