ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Fluid power pump and motor manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

14

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $598k 85k
MMBtu
$9.70
- Electrical $382k 6,984k
kWh
$0.065
- Natural Gas $70k 13k
MMBtu
$8.22

100

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $79k 7.8k
MMBtu
9.2%
- Electrical $48k 765k
kWh
10.9%
- Natural Gas $16k -
MMBtu
-
Waste $1.8k
Productivity/Other $11k
TOTAL $92k
*May be negative reflecting an increased cost component required to save energy and costs overall

11

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $586k 94k
MMBtu
$8.13
- Electrical $369k 7,491k
kWh
$0.057
- Natural Gas $86k 17k
MMBtu
$6.99

32

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $10k 1.4k
MMBtu
1.5%
- Electrical $7.0k 137k
kWh
1.8%
- Natural Gas $1.8k -
MMBtu
-
Waste $1.4k
Productivity/Other $2.1k
TOTAL $14k
*May be negative reflecting an increased cost component required to save energy and costs overall