ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Fluid power cylinder and actuator manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

19

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $471k 53k
MMBtu
$9.49
- Electrical $280k 4,261k
kWh
$0.055
- Natural Gas $50k 7.8k
MMBtu
$6.46

131

Recommendations

6.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $103k 5.0k
MMBtu
9.6%
- Electrical $37k 490k
kWh
11.5%
- Natural Gas $8.7k -
MMBtu
-
Waste ($-0.7)k
Productivity/Other $32k
TOTAL $134k
*May be negative reflecting an increased cost component required to save energy and costs overall

14

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $489k 60k
MMBtu
$8.27
- Electrical $324k 4,962k
kWh
$0.051
- Natural Gas $57k 8.9k
MMBtu
$6.21

46

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 2.4k
MMBtu
4.1%
- Electrical $11k 238k
kWh
4.8%
- Natural Gas $1.9k -
MMBtu
-
Waste -
Productivity/Other $1.0k
TOTAL $19k
*May be negative reflecting an increased cost component required to save energy and costs overall