ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Industrial process furnace and oven manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

6

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $273k 31k
MMBtu
$11.04
- Electrical $125k 2,108k
kWh
$0.073
- Natural Gas $66k 9.7k
MMBtu
$10.42

48

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $62k 5.1k
MMBtu
16.1%
- Electrical $37k 494k
kWh
23.5%
- Natural Gas $17k -
MMBtu
-
Waste -
Productivity/Other $14k
TOTAL $77k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $270k 32k
MMBtu
$11.28
- Electrical $113k 2,043k
kWh
$0.073
- Natural Gas $69k 11k
MMBtu
$10.13

9

Implemented Recommendations

1.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 0.7k
MMBtu
2.2%
- Electrical $3.2k 67k
kWh
3.3%
- Natural Gas $12k -
MMBtu
-
Waste -
Productivity/Other ($0.0)k
TOTAL $17k
*May be negative reflecting an increased cost component required to save energy and costs overall