ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 333994 Industrial process furnace and oven manufacturing

6

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $273k 31k
MMBtu
$11.04
- Electrical $125k 2,108k
kWh
$0.073
- Natural Gas $66k 9.7k
MMBtu
$10.42

48

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $62k 5.1k
MMBtu
16.1%
- Electrical $37k 494k
kWh
23.5%
- Natural Gas $17k -
MMBtu
-
Waste -
Productivity/Other $14k
TOTAL $77k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $315k 39k
MMBtu
$9.23
- Electrical $131k 2,454k
kWh
$0.065
- Natural Gas $85k 13k
MMBtu
$7.97

6

Implemented Recommendations

1.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 0.8k
MMBtu
2.0%
- Electrical $3.0k 74k
kWh
3.0%
- Natural Gas $15k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $19k