ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Industrial process furnace and oven manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $270k 32k
MMBtu
$11.28
- Electrical $113k 2,043k
kWh
$0.073
- Natural Gas $69k 11k
MMBtu
$10.13

38

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $42k 2.2k
MMBtu
7.0%
- Electrical $16k 218k
kWh
10.7%
- Natural Gas $18k -
MMBtu
-
Waste -
Productivity/Other $6.4k
TOTAL $49k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $315k 39k
MMBtu
$9.23
- Electrical $131k 2,454k
kWh
$0.065
- Natural Gas $85k 13k
MMBtu
$7.97

6

Implemented Recommendations

1.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 0.8k
MMBtu
2.0%
- Electrical $3.0k 74k
kWh
3.0%
- Natural Gas $15k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $19k
*May be negative reflecting an increased cost component required to save energy and costs overall