ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Welding and soldering equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $217k 27k
MMBtu
$8.25
- Electrical $145k 2,353k
kWh
$0.060
- Natural Gas $12k 3.0k
MMBtu
$5.11

45

Recommendations

6.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $44k 4.2k
MMBtu
15.5%
- Electrical $27k 410k
kWh
17.4%
- Natural Gas $2.3k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $45k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $217k 27k
MMBtu
$8.25
- Electrical $145k 2,353k
kWh
$0.060
- Natural Gas $12k 3.0k
MMBtu
$5.11

17

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 2.7k
MMBtu
10.0%
- Electrical $18k 263k
kWh
11.2%
- Natural Gas $0.2k -
MMBtu
-
Waste -
Productivity/Other $0.1k
TOTAL $27k
*May be negative reflecting an increased cost component required to save energy and costs overall