ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Power-driven handtool manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,542k 236k
MMBtu
$7.73
- Electrical $845k 19,001k
kWh
$0.051
- Natural Gas $317k 41k
MMBtu
$8.97

40

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $125k 16k
MMBtu
6.8%
- Electrical $70k 1,554k
kWh
8.2%
- Natural Gas $36k -
MMBtu
-
Waste $0.5k
Productivity/Other $2.2k
TOTAL $128k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,542k 236k
MMBtu
$7.73
- Electrical $845k 19,001k
kWh
$0.051
- Natural Gas $317k 41k
MMBtu
$8.97

15

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $85k 10k
MMBtu
4.4%
- Electrical $45k 1,014k
kWh
5.3%
- Natural Gas $33k -
MMBtu
-
Waste -
Productivity/Other $0.7k
TOTAL $86k
*May be negative reflecting an increased cost component required to save energy and costs overall