The ITAC Statistics page displays the average assessment results for the selected criteria.
| ARC | 2+ Digits Required | |
| NAICS | Industrial truck, tractor, trailer, and stacker machinery manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
20
Matching Assessments
| Initial Plant Size Averages | Costs | Usage | Unit Cost | |
|---|---|---|---|---|
| All Energy | $716k | 97k |
MMBtu
|
$8.30 |
| - Electrical | $358k | 7,047k |
kWh
|
$0.055 |
| - Natural Gas | $228k | 24k |
MMBtu
|
$8.82 |
146
Recommendations
7.3
Recommendations Per Assessment
| Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
|---|---|---|---|---|
| All Energy | $83k | 8.6k |
MMBtu
|
8.9% |
| - Electrical | $42k | 841k |
kWh
|
11.9% |
| - Natural Gas | $24k | - |
MMBtu
|
- |
| Waste | $1.7k | |||
| Productivity/Other | $64k | |||
| TOTAL | $148k | |||
| *May be negative reflecting an increased cost component required to save energy and costs overall | ||||
20
with Implementation Data
| Initial Plant Size Averages | Costs | Usage | Unit Cost | |
|---|---|---|---|---|
| All Energy | $716k | 97k |
MMBtu
|
$8.30 |
| - Electrical | $358k | 7,047k |
kWh
|
$0.055 |
| - Natural Gas | $228k | 24k |
MMBtu
|
$8.82 |
71
Implemented Recommendations
3.6
Implemented Per Assessment
| Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
|---|---|---|---|---|
| All Energy | $23k | 2.6k |
MMBtu
|
2.7% |
| - Electrical | $15k | 258k |
kWh
|
3.7% |
| - Natural Gas | $4.6k | - |
MMBtu
|
- |
| Waste | $1.2k | |||
| Productivity/Other | $45k | |||
| TOTAL | $70k | |||
| *May be negative reflecting an increased cost component required to save energy and costs overall | ||||