The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC | 2+ Digits Required | |
NAICS | Overhead traveling crane, hoist, and monorail system manufacturing | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
14
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $369k | 53k |
MMBtu
|
$7.72 |
- Electrical | $211k | 3,845k |
kWh
|
$0.061 |
- Natural Gas | $99k | 13k |
MMBtu
|
$6.75 |
118
Recommendations
8.4
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $79k | 7.4k |
MMBtu
|
14.0% |
- Electrical | $43k | 719k |
kWh
|
18.7% |
- Natural Gas | $30k | - |
MMBtu
|
- |
Waste | $4.7k | |||
Productivity/Other | $34k | |||
TOTAL | $118k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
13
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $390k | 56k |
MMBtu
|
$7.32 |
- Electrical | $221k | 4,095k |
kWh
|
$0.055 |
- Natural Gas | $106k | 14k |
MMBtu
|
$6.69 |
59
Implemented Recommendations
4.5
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $34k | 4.4k |
MMBtu
|
7.9% |
- Electrical | $24k | 433k |
kWh
|
10.6% |
- Natural Gas | $6.5k | - |
MMBtu
|
- |
Waste | $1.1k | |||
Productivity/Other | $1.2k | |||
TOTAL | $36k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |