The ITAC Statistics page displays the average assessment results for the selected criteria.
| ARC | 2+ Digits Required | |
| NAICS | Overhead traveling crane, hoist, and monorail system manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
16
Matching Assessments
| Initial Plant Size Averages | Costs | Usage | Unit Cost | |
|---|---|---|---|---|
| All Energy | $375k | 53k |
MMBtu
|
$7.72 |
| - Electrical | $212k | 3,779k |
kWh
|
$0.062 |
| - Natural Gas | $102k | 14k |
MMBtu
|
$6.67 |
132
Recommendations
8.3
Recommendations Per Assessment
| Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
|---|---|---|---|---|
| All Energy | $75k | 6.6k |
MMBtu
|
12.6% |
| - Electrical | $38k | 644k |
kWh
|
17.1% |
| - Natural Gas | $31k | - |
MMBtu
|
- |
| Waste | $4.1k | |||
| Productivity/Other | $34k | |||
| TOTAL | $113k | |||
| *May be negative reflecting an increased cost component required to save energy and costs overall | ||||
14
with Implementation Data
| Initial Plant Size Averages | Costs | Usage | Unit Cost | |
|---|---|---|---|---|
| All Energy | $369k | 53k |
MMBtu
|
$7.72 |
| - Electrical | $211k | 3,845k |
kWh
|
$0.061 |
| - Natural Gas | $99k | 13k |
MMBtu
|
$6.75 |
60
Implemented Recommendations
4.3
Implemented Per Assessment
| Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
|---|---|---|---|---|
| All Energy | $31k | 4.1k |
MMBtu
|
7.8% |
| - Electrical | $23k | 402k |
kWh
|
10.5% |
| - Natural Gas | $6.0k | - |
MMBtu
|
- |
| Waste | $1.0k | |||
| Productivity/Other | $1.2k | |||
| TOTAL | $34k | |||
| *May be negative reflecting an increased cost component required to save energy and costs overall | ||||