ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Overhead traveling crane, hoist, and monorail system manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

14

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $369k 53k
MMBtu
$7.72
- Electrical $211k 3,845k
kWh
$0.061
- Natural Gas $99k 13k
MMBtu
$6.75

118

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $79k 7.4k
MMBtu
14.0%
- Electrical $43k 719k
kWh
18.7%
- Natural Gas $30k -
MMBtu
-
Waste $4.7k
Productivity/Other $34k
TOTAL $118k
*May be negative reflecting an increased cost component required to save energy and costs overall

13

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $390k 56k
MMBtu
$7.32
- Electrical $221k 4,095k
kWh
$0.055
- Natural Gas $106k 14k
MMBtu
$6.69

59

Implemented Recommendations

4.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 4.4k
MMBtu
7.9%
- Electrical $24k 433k
kWh
10.6%
- Natural Gas $6.5k -
MMBtu
-
Waste $1.1k
Productivity/Other $1.2k
TOTAL $36k
*May be negative reflecting an increased cost component required to save energy and costs overall