ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Elevator and moving stairway manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

8

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,074k 131k
MMBtu
$8.13
- Electrical $494k 8,202k
kWh
$0.053
- Natural Gas $311k 46k
MMBtu
$6.24

73

Recommendations

9.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $123k 9.3k
MMBtu
7.1%
- Electrical $47k 911k
kWh
11.1%
- Natural Gas $64k -
MMBtu
-
Waste $0.1k
Productivity/Other $31k
TOTAL $155k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,074k 131k
MMBtu
$8.13
- Electrical $494k 8,202k
kWh
$0.053
- Natural Gas $311k 46k
MMBtu
$6.24

40

Implemented Recommendations

5.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $57k 5.8k
MMBtu
4.4%
- Electrical $31k 566k
kWh
6.9%
- Natural Gas $19k -
MMBtu
-
Waste -
Productivity/Other $29k
TOTAL $86k
*May be negative reflecting an increased cost component required to save energy and costs overall