ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Material handling equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

62

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $536k 71k
MMBtu
$8.22
- Electrical $265k 4,958k
kWh
$0.056
- Natural Gas $157k 20k
MMBtu
$6.89

497

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $73k 6.8k
MMBtu
9.5%
- Electrical $35k 659k
kWh
13.3%
- Natural Gas $25k -
MMBtu
-
Waste $1.7k
Productivity/Other $36k
TOTAL $111k
*May be negative reflecting an increased cost component required to save energy and costs overall

55

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $557k 75k
MMBtu
$8.05
- Electrical $275k 5,222k
kWh
$0.053
- Natural Gas $167k 21k
MMBtu
$6.83

208

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $26k 3.0k
MMBtu
4.0%
- Electrical $15k 291k
kWh
5.6%
- Natural Gas $6.0k -
MMBtu
-
Waste $0.3k
Productivity/Other $22k
TOTAL $48k
*May be negative reflecting an increased cost component required to save energy and costs overall