ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Material handling equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

67

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $518k 68k
MMBtu
$8.25
- Electrical $257k 4,756k
kWh
$0.057
- Natural Gas $151k 19k
MMBtu
$6.90

537

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $74k 6.7k
MMBtu
9.8%
- Electrical $35k 656k
kWh
13.8%
- Natural Gas $25k -
MMBtu
-
Waste $1.5k
Productivity/Other $35k
TOTAL $110k
*May be negative reflecting an increased cost component required to save energy and costs overall

64

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $528k 70k
MMBtu
$8.24
- Electrical $262k 4,878k
kWh
$0.057
- Natural Gas $153k 19k
MMBtu
$6.93

244

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $26k 2.9k
MMBtu
4.2%
- Electrical $16k 282k
kWh
5.8%
- Natural Gas $6.2k -
MMBtu
-
Waste $0.6k
Productivity/Other $19k
TOTAL $46k