ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Material handling equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

65

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $524k 69k
MMBtu
$8.21
- Electrical $260k 4,835k
kWh
$0.057
- Natural Gas $153k 20k
MMBtu
$6.89

523

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $73k 6.7k
MMBtu
9.7%
- Electrical $35k 653k
kWh
13.5%
- Natural Gas $25k -
MMBtu
-
Waste $1.6k
Productivity/Other $35k
TOTAL $109k
*May be negative reflecting an increased cost component required to save energy and costs overall

62

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $537k 71k
MMBtu
$8.23
- Electrical $264k 4,952k
kWh
$0.056
- Natural Gas $158k 20k
MMBtu
$6.86

234

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.8k
MMBtu
4.0%
- Electrical $15k 274k
kWh
5.5%
- Natural Gas $6.4k -
MMBtu
-
Waste $0.6k
Productivity/Other $20k
TOTAL $45k
*May be negative reflecting an increased cost component required to save energy and costs overall