ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Pump and pumping equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

38

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $406k 49k
MMBtu
$9.32
- Electrical $242k 4,105k
kWh
$0.064
- Natural Gas $52k 6.9k
MMBtu
$7.94

306

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $57k 6.1k
MMBtu
12.5%
- Electrical $37k 598k
kWh
14.6%
- Natural Gas $9.2k -
MMBtu
-
Waste $4.7k
Productivity/Other $13k
TOTAL $75k
*May be negative reflecting an increased cost component required to save energy and costs overall

37

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $403k 49k
MMBtu
$9.36
- Electrical $241k 4,055k
kWh
$0.065
- Natural Gas $53k 7.1k
MMBtu
$7.90

116

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 2.3k
MMBtu
4.7%
- Electrical $15k 224k
kWh
5.5%
- Natural Gas $1.5k -
MMBtu
-
Waste $1.0k
Productivity/Other $6.2k
TOTAL $28k
*May be negative reflecting an increased cost component required to save energy and costs overall