ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Pump and compressor manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

53

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $467k 61k
MMBtu
$9.19
- Electrical $270k 4,986k
kWh
$0.063
- Natural Gas $74k 9.7k
MMBtu
$9.20

404

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $59k 6.1k
MMBtu
10.0%
- Electrical $35k 595k
kWh
11.9%
- Natural Gas $11k -
MMBtu
-
Waste $3.8k
Productivity/Other $11k
TOTAL $74k
*May be negative reflecting an increased cost component required to save energy and costs overall

51

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $479k 63k
MMBtu
$9.24
- Electrical $278k 5,127k
kWh
$0.064
- Natural Gas $76k 9.8k
MMBtu
$9.32

157

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 2.9k
MMBtu
4.6%
- Electrical $17k 280k
kWh
5.5%
- Natural Gas $4.9k -
MMBtu
-
Waste $1.2k
Productivity/Other $4.9k
TOTAL $34k
*May be negative reflecting an increased cost component required to save energy and costs overall