ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Speed changer, industrial high-speed drive, and gear manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

12

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $650k 106k
MMBtu
$8.29
- Electrical $352k 8,039k
kWh
$0.058
- Natural Gas $132k 24k
MMBtu
$6.55

108

Recommendations

9.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $80k 9.6k
MMBtu
9.1%
- Electrical $54k 940k
kWh
11.7%
- Natural Gas $11k -
MMBtu
-
Waste $3.2k
Productivity/Other $146k
TOTAL $229k
*May be negative reflecting an increased cost component required to save energy and costs overall

12

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $650k 106k
MMBtu
$8.29
- Electrical $352k 8,039k
kWh
$0.058
- Natural Gas $132k 24k
MMBtu
$6.55

43

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 4.2k
MMBtu
3.9%
- Electrical $22k 408k
kWh
5.1%
- Natural Gas $2.3k -
MMBtu
-
Waste -
Productivity/Other $74k
TOTAL $102k
*May be negative reflecting an increased cost component required to save energy and costs overall