ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Engine, turbine, and power transmission equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

70

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $864k 121k
MMBtu
$8.41
- Electrical $500k 9,067k
kWh
$0.063
- Natural Gas $176k 27k
MMBtu
$6.90

593

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $116k 12k
MMBtu
9.9%
- Electrical $75k 1,164k
kWh
12.8%
- Natural Gas $22k -
MMBtu
-
Waste $4.4k
Productivity/Other $37k
TOTAL $157k
*May be negative reflecting an increased cost component required to save energy and costs overall

65

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $850k 121k
MMBtu
$8.22
- Electrical $495k 9,075k
kWh
$0.062
- Natural Gas $177k 28k
MMBtu
$6.65

235

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $36k 4.2k
MMBtu
3.5%
- Electrical $25k 412k
kWh
4.5%
- Natural Gas $6.5k -
MMBtu
-
Waste $0.1k
Productivity/Other $14k
TOTAL $50k
*May be negative reflecting an increased cost component required to save energy and costs overall