ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Engine, turbine, and power transmission equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

75

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $859k 118k
MMBtu
$8.62
- Electrical $500k 9,005k
kWh
$0.064
- Natural Gas $167k 26k
MMBtu
$7.12

626

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $114k 12k
MMBtu
9.8%
- Electrical $74k 1,133k
kWh
12.6%
- Natural Gas $20k -
MMBtu
-
Waste $4.1k
Productivity/Other $39k
TOTAL $157k
*May be negative reflecting an increased cost component required to save energy and costs overall

69

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $852k 120k
MMBtu
$8.38
- Electrical $490k 8,990k
kWh
$0.063
- Natural Gas $176k 27k
MMBtu
$6.82

261

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $38k 4.4k
MMBtu
3.6%
- Electrical $25k 425k
kWh
4.7%
- Natural Gas $6.4k -
MMBtu
-
Waste $0.0k
Productivity/Other $18k
TOTAL $56k
*May be negative reflecting an increased cost component required to save energy and costs overall