ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Engine, turbine, and power transmission equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

72

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $869k 121k
MMBtu
$8.40
- Electrical $505k 9,155k
kWh
$0.063
- Natural Gas $173k 27k
MMBtu
$7.04

603

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $115k 12k
MMBtu
9.8%
- Electrical $74k 1,155k
kWh
12.6%
- Natural Gas $21k -
MMBtu
-
Waste $4.2k
Productivity/Other $36k
TOTAL $155k
*May be negative reflecting an increased cost component required to save energy and costs overall

66

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $843k 120k
MMBtu
$8.28
- Electrical $489k 8,981k
kWh
$0.062
- Natural Gas $175k 27k
MMBtu
$6.81

242

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $36k 4.2k
MMBtu
3.5%
- Electrical $24k 411k
kWh
4.6%
- Natural Gas $6.4k -
MMBtu
-
Waste $0.1k
Productivity/Other $16k
TOTAL $52k
*May be negative reflecting an increased cost component required to save energy and costs overall