ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Engine, turbine, and power transmission equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

67

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $831k 118k
MMBtu
$8.39
- Electrical $483k 8,853k
kWh
$0.063
- Natural Gas $172k 27k
MMBtu
$6.82

571

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $105k 11k
MMBtu
9.1%
- Electrical $66k 1,048k
kWh
11.8%
- Natural Gas $22k -
MMBtu
-
Waste $4.6k
Productivity/Other $34k
TOTAL $144k
*May be negative reflecting an increased cost component required to save energy and costs overall

64

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $855k 123k
MMBtu
$7.98
- Electrical $498k 9,191k
kWh
$0.061
- Natural Gas $180k 28k
MMBtu
$6.64

235

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $36k 4.3k
MMBtu
3.5%
- Electrical $25k 418k
kWh
4.5%
- Natural Gas $6.6k -
MMBtu
-
Waste $0.1k
Productivity/Other $15k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall