ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Machine tool manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

37

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $419k 59k
MMBtu
$8.89
- Electrical $262k 4,820k
kWh
$0.065
- Natural Gas $68k 9.9k
MMBtu
$7.30

282

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $44k 4.1k
MMBtu
6.9%
- Electrical $22k 399k
kWh
8.3%
- Natural Gas $13k -
MMBtu
-
Waste $1.5k
Productivity/Other $5.5k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall

36

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $424k 61k
MMBtu
$8.75
- Electrical $267k 4,922k
kWh
$0.064
- Natural Gas $69k 10.0k
MMBtu
$7.28

129

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.1k
MMBtu
3.5%
- Electrical $11k 205k
kWh
4.2%
- Natural Gas $9.6k -
MMBtu
-
Waste $0.5k
Productivity/Other $3.7k
TOTAL $29k
*May be negative reflecting an increased cost component required to save energy and costs overall