The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 333511 Industrial mold manufacturing

24

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $362k 42k
MMBtu
$9.25
- Electrical $242k 3,671k
kWh
$0.073
- Natural Gas $33k 3.7k
MMBtu
$7.97

188

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 4.0k
MMBtu
9.6%
- Electrical $24k 387k
kWh
10.5%
- Natural Gas $6.1k -
MMBtu
-
Waste $0.1k
Productivity/Other $6.0k
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall

24

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $362k 42k
MMBtu
$9.25
- Electrical $242k 3,671k
kWh
$0.073
- Natural Gas $33k 3.7k
MMBtu
$7.97

99

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 2.4k
MMBtu
5.8%
- Electrical $15k 234k
kWh
6.4%
- Natural Gas $0.2k -
MMBtu
-
Waste $0.1k
Productivity/Other $3.2k
TOTAL $26k
*May be negative reflecting an increased cost component required to save energy and costs overall