The ITAC Statistics page displays the average assessment results for the selected criteria.
102
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $393k | 50k |
MMBtu
|
$9.38 |
- Electrical | $253k | 4,061k |
kWh
|
$0.072 |
- Natural Gas | $50k | 7.8k |
MMBtu
|
$7.30 |
800
Recommendations
7.8
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $43k | 3.9k |
MMBtu
|
7.8% |
- Electrical | $24k | 379k |
kWh
|
9.3% |
- Natural Gas | $9.2k | - |
MMBtu
|
- |
Waste | $0.9k | |||
Productivity/Other | $36k | |||
TOTAL | $80k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
100
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $396k | 50k |
MMBtu
|
$9.29 |
- Electrical | $255k | 4,119k |
kWh
|
$0.071 |
- Natural Gas | $50k | 7.9k |
MMBtu
|
$7.30 |
391
Implemented Recommendations
3.9
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $22k | 1.7k |
MMBtu
|
3.4% |
- Electrical | $10k | 168k |
kWh
|
4.1% |
- Natural Gas | $5.7k | - |
MMBtu
|
- |
Waste | $0.2k | |||
Productivity/Other | $29k | |||
TOTAL | $51k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |